After a Memorial Day with no construction, Rumson-Sea Bright Bridge replacement continues Tuesday through Thursday during the usual 7 a.m. to 5:30 p.m. hours and a cut 3:30 p.m. on Friday and one major development in bridge traversing. The sidewalk across the bridge has been reopened.
Monmouth County officials’ travel advisory for users of the bridge roadway, sidewalk and waterway is as follows …
Roadway and sidewalk users
- The eastbound (south side) sidewalk on the bridge has been reopened for pedestrians and bicyclists.
- All roadway and sidewalk travelers should be aware of construction and delivery vehicles entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
Waterway users
- Bridge replacement work activity continues on both sides of the Shrewsbury River south of the bridge.
- The 65-foot navigational channel width is expected to remain in effect until the fall of 2023.
- Please see the Public Notice for information on future changes to channel access.
- Prosecutor: 18-Year-Old Found Guilty of 2022 Murder
- Retro ‘Ho, No!’ Santa Time
- Prosecutor: Former Middletown Cop Indicted on 22 Counts of Official Misconduct, Illegal Firearms and Drug Charges
- Remembering Fair Haven’s Garry Allers: A Lifetime of Relative Kindness Passed On
- Scene Around: Cooper Ley’s Gift of Art Given by His Sister
You must be logged in to post a comment.