Rumson-Sea Bright Bridge construction work remains status quo, with an alternating traffic alert for Tuesday. All construction continues this week on the usual 7 a.m. to 3:30 p.m. schedule though Friday, weather permitting.
Bridge travelers are alerted to allow for extra travel time on Tuesday, May 21.
• Both Rumson and Sea Bright side travelers should expect alternating traffic from 9 a.m. to 2 p.m. as crews work to repair potholes on the existing bridge.
Monmouth County Officials’ Status Quo Travel Advisory for Rumson and Sea Bright Sides
Land travelers are reminded …
- The south side (eastbound) sidewalk of the bridge is closed.
- All roadway and sidewalk travelers should be aware of construction and delivery vehicles entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
Waterway travelers are reminded …
- For channel closure information, click here.
- Bridge replacement work activity continues on both sides of the Shrewsbury River south of the bridge.
— Photos/Nick Lencyzk
- Prosecutor: Man Imprisoned for Violent Assault Gets Three More Years for Stalking Stemming from Home Invasion
- Retro RFH Preppie Hippie Halloweening
- In Memoriam: Red Bank-Raised RBC 2014 Grad, Connor Smith, 29
- Retro RFH Witchy Women’s Halloween Ride
- Rumson-Sea Bright Bridge Channel Closure and Roadway Advisory
You must be logged in to post a comment.