The Rumson-Sea Bright Bridge is open and fully functional, but work continues.
The contractor is scheduled to continue construction phase work on weekdays from 7 a.m. to 3:30 p.m., weather permitting. Construction vehicles will continue to enter and exit the work areas on Rumson Road in Rumson and on Ocean Avenue in Sea Bright.

Roadway and Sidewalk Information
- The sidewalk on the north side of the bridge is closed.
- Delays are possible due to construction activities.
- Motorists and pedestrians should be aware of new traffic patterns associated with use of the new bridge.
Waterway Information
- Normal bridge operations are expected (see Monmouth County Movable Bridge Schedule). All bridge openings are on signal.
- The United States Coast Guard (USCG) has jurisdiction over the navigational channel. USCG may grant permission for partial closures of the channel and/or for temporary deviation from normal drawbridge operations. Monmouth County must comply with instructions from USCG.