This week’s Rumson-Sea Bright Bridge replacement activity continues Monday through Friday during the hours of 7 a.m. to 5:30 p.m. every day with a few new notes to roadway and sidewalk users.
Monmouth County officials advise …
Roadway and sidewalk users should be aware of some changes in that area. This means …
- Vehicles must keep the intersection area near the bridge clear of traffic. Note that recent pavement restriping in Rumson included a “Do Not Block Intersection” roadway marking (a large X inside a rectangle). During bridge openings or other situations, if vehicles back-up on Rumson Road, this area should remain clear to allow vehicles on Ward and South Ward Avenues to cross Rumson Road.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
- All roadway and sidewalk travelers should be aware of construction and delivery vehicles entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- The eastbound (south side) sidewalk on the bridge has been reopened for pedestrians and bicyclists.
Waterway users should maintain an awareness of construction activity. This means …
- Bridge replacement work activity continues on both sides of the Shrewsbury River south of the bridge.
- The 65-foot navigational channel width is expected to remain in effect until the fall of 2023.
- Please see the Public Notice for information on future changes to channel access.
- Prosecutor: 18-Year-Old Found Guilty of 2022 Murder
- Retro ‘Ho, No!’ Santa Time
- Prosecutor: Former Middletown Cop Indicted on 22 Counts of Official Misconduct, Illegal Firearms and Drug Charges
- Remembering Fair Haven’s Garry Allers: A Lifetime of Relative Kindness Passed On
- Scene Around: Cooper Ley’s Gift of Art Given by His Sister
You must be logged in to post a comment.