This is a test. A trial measure is in place to abate seasonally high traffic volume between Rumson and Sea Bright.
The Rumson-Sea Bright Bridge, the drawbridge which spans over the Shrewsbury River, will open less frequently, on the hour only rather than every half hour, on Fridays, Saturdays, Sundays and holidays this summer season. The trial begins on Friday, May 25, and will be in effect through Sept. 3.
Continue reading Rumson-Sea Bright Bridge Openings Set to Change
You must be logged in to post a comment.