By Elaine Van Develde
“The cul-de-sac is no longer an option,” a Monmouth County project coordinator could be heard telling Rumson residents about a hotly contested proposed cul-de-sac on Ward Avenue that was to be an option for intersection improvements that are to come with the 2020 Rumson-Sea Bright Bridge replacement. “People were strongly opposed to the concept, so it has been eliminated.”
It’s one component of what was revealed about conceptual plans at a public information forum on the estimated $60-million federally-funded bridge project at Rumson-Fair Haven Regional High School Wednesday night. Another was held earlier in Sea Bright.
The 66-year-old historic drawbridge, deemed in serious condition a few years ago, is slated for replacement with a similar structure spanning the Shrewsbury River to the south of the original bridge. Though nothing is set in concrete and steel yet, county officials cautioned, it’s a definite that the existing bridge will remain functional as the new one is built parallel to it, significantly minimizing if not eliminating the need for detours during construction.
You must be logged in to post a comment.