In this week’s Rumson-Sea Bright Bridge replacement travel advisory for the Rumson-Fair Haven area, Monmouth County officials are alerting drivers that they should allow for extra travel time from Monday through Friday, noting the hours of 7 a.m. to 3:30 p.m. Monday through Friday.
County officials advise …
Drivers, walkers and cyclists maintain awareness of construction vehicle activity. This means …
- Temporary delays are possible on any contractor work day as construction vehicles enter and exit the work areas.
Walkers and cyclists maintain awareness that the eastbound sidewalk on the bridge is closed. This means …
- The sidewalk on the south side of the bridge will be closed until further notice. Sidewalk users must use the north side (westbound) walkway to cross the bridge.
Construction activity is continuing in the Shrewsbury River. This means …
- Bridge replacement work is ongoing on both sides of the river south of the bridge.
- The 65’ navigational channel width is expected to remain in effect until Fall 2023.
- Retro RFH Tower Players’ Fall Play Time
- In Memoriam: Little Silver-Raised Red Bank High School ’56 Grad, Ed Apy, 88
- Scene Around: RFH Tower Players’ Dressed & Set for ‘Nutcracker’
- Police Report: $2.2K Theft, Aggravated Assault, Weapons Possession, Terroristic Threats, Drug Possession, Fugitive from Justice, DWI, Disorderly, Criminal Mischief
- In Memoriam: Red Bank-Raised Longtime Rumsonite Ted Leddy, 87
You must be logged in to post a comment.