With the Rumson-Sea Bright Bridge replacement getting closer to completion, the work schedule remains status quo, from 7 a.m. to 3:30 p.m. though Friday, weather permitting. Though, travelers should maintain an awareness of ongoing roadwork in the area surrounding the bridge.
Monmouth County officials advise …
Land travelers are reminded …
- The south side (eastbound) sidewalk of the bridge is closed.
- All roadway and sidewalk travelers should be aware of construction and delivery vehicles entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
Waterway travelers are reminded …
- Bridge replacement work activity continues on both sides of the Shrewsbury River south of the bridge.
- Monmouth County is in coordination with the U.S. Coast Guard regarding channel closure dates. Information will be posted when the determination has been made.
— Photos/Nick Lenczyk
- Prosecutor: 18-Year-Old Found Guilty of 2022 Murder
- Retro ‘Ho, No!’ Santa Time
- Prosecutor: Former Middletown Cop Indicted on 22 Counts of Official Misconduct, Illegal Firearms and Drug Charges
- Remembering Fair Haven’s Garry Allers: A Lifetime of Relative Kindness Passed On
- Scene Around: Cooper Ley’s Gift of Art Given by His Sister
You must be logged in to post a comment.