Rumson-Sea Bright Bridge replacement activity is on its status quo construction hours schedule, from 7 a.m. to 3:30 p.m. through Friday, weather permitting, with a schedule of the new bridge openings in effect. The precise construction that is scheduled is listed below. Shrewsbury River tides and travel advisory information is also included.

Tides information for the Shrewsbury River, Rumson Neck area and Sea Bright, courtesy of tideschart.com, can be found here.

On the Shrewsbury River waterway ...
The current schedule for the new bridge span is as follows:

Dates and times are subject to change based on weather conditions and production factors.
The United States Coast Guard (USCG) has jurisdiction over the navigational channel. USCG may grant permission for partial closures of the channel and/or for temporary deviation from normal drawbridge operations. Monmouth County must comply with instructions from USCG.
On the roadways and sidewalks surrounding and on the bridge …
- Be aware of traffic pattern changes and possible travel delays in Sea Bright at the intersection of Ocean Avenue and Rumson Road.
- Be aware of traffic pattern changes and possible travel delays in Rumson at the intersection of Rumson Road with South Ward and Ward avenues
- Construction and delivery vehicles will continue entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
- The south side (eastbound) sidewalk of the bridge is closed.
Scheduled Construction Activities
Rumson
- installation of interior finishes at Control House
- bridge balancing
- control system commissioning
- acceptance testing
- installation of 4-bar rail
- installation of receptacles, lighting, tap boxes, CCTV & exterior lighting
Sea Bright
- installation of interior finishes at gatekeeper house
- acceptance testing
- bridge balancing
- control system commissioning
- installation of 4-bar rail
- installation of MCCs, drive cabinets, PLC cabinets

— Photos/Nick Lencyzk
- Fair Haven Day: A Community Summer Birthday Bash Set for Saturday
- Fair Haven Storm: Hundreds Still Without Power; Cooling, Charging Station Opened
- In Memoriam: Monmouth Beach Resident, Munoz Engineering Owner, Patricio Munoz, 89
- In Memoriam: Area Resident, Maryanne Lombardi Brancazio, 81
- Retro RFH Graduation: The Daisy Chain Girl
You must be logged in to post a comment.