Rumson-Sea Bright Bridge replacement construction activity has expanded work hours this week. Construction will continue from 7 a.m. to 5:30 p.m., weather permitting, Monday through Friday, March 8.
Monmouth County officials advise that …
Drivers should maintain an awareness of construction and delivery vehicles. This means …
- All roadway and sidewalk travelers should be aware of construction and delivery vehicles entering and exiting the work areas on both sides of Rumson Road in Rumson and on the southbound side of Ocean Avenue in Sea Bright.
- Temporary delays are possible on any contractor work day due to movement of construction vehicles and equipment.
Water travelers should maintain an awareness of construction work continuing in the Shrewsbury River. This means …
- Bridge replacement work activity continues on both sides of the Shrewsbury River south of the bridge.
- Please note the channel closure dates have changed. See Recent News for an update on future changes to channel access.
— Photos/Nick Lenczyk
- Rumson-Sea Bright Bridge Travel Advisory
- In Memoriam: Lifelong Area Resident, RBC Grad, St. James Teacher & Drama Director, Barbara Hollywood Oakerson, 79
- In Memoriam: Former Longtime Little Silver Resident, RBR Grad, Artist, Kevin Adams, 67
- Prosecutor: Two Men Get Prison Terms for 2017 Stalking, Home Invasion
- In Memoriam: Longtime Fair Havenite, Joe Rafferty, 90
You must be logged in to post a comment.